<body><script type="text/javascript"> function setAttributeOnload(object, attribute, val) { if(window.addEventListener) { window.addEventListener('load', function(){ object[attribute] = val; }, false); } else { window.attachEvent('onload', function(){ object[attribute] = val; }); } } </script> <div id="navbar-iframe-container"></div> <script type="text/javascript" src="https://apis.google.com/js/platform.js"></script> <script type="text/javascript"> gapi.load("gapi.iframes:gapi.iframes.style.bubble", function() { if (gapi.iframes && gapi.iframes.getContext) { gapi.iframes.getContext().openChild({ url: 'https://www.blogger.com/navbar/5437210455023297367?origin\x3dhttp://silversister.blogspot.com', where: document.getElementById("navbar-iframe-container"), id: "navbar-iframe" }); } }); </script>



♥ The Long-sighted Woman 小女子目花



Website Signs & Any other bits about you (:


♥ Boosters 强心针



魔蠍王
Octo Patchi
山龟小姐
随心
Link
Link
Link


♥ Her Story 历史



  • December 2007
  • January 2008
  • February 2008
  • March 2008
  • April 2008
  • July 2008
  • December 2008
  • March 2009
  • January 2010
  • June 2010


    ♥ Wish Upon A Star 许愿

    Desires.
    Whatever you're hoping for.


    ♥ Anything Under the Sun 天马行空


    .


    ♥ Thank you 谢谢



    Designer } Char issa:D
    Icons/Hosting } Photobucket
    Others } Blogger , Blogskins. (:
    Inspirations } Michelle
    Website Signs
  • ♥ Friday, February 22, 2008

    On 21 February 2008 (Thursday), my father and I met with the renovation contractors.

    They will be responsible for the following works:
    • tiling living room and all bedroom floor
    • painting living room and all 3 bedrooms
    • making and installing kitchen cabinet
    • fixing all electrical works including ceiling fan, water heater
    • fixing all other fixtures e.g. bathroom cabinet and FOC dish-drying rack

    We were also ferried to the sub-contractors' place. The first stop was to choose floor tiles. The second stop was to choose all lighting and electrical appliances i.e. lighting for living room, 3 bedrooms, passageway, 2 bathrooms, storeroom plus ceiling fan. The third stop was to choose kitchen and bathroom accessories i.e. cooker (without hood), kitchen sink, kitchen tap, bathroom cabinet with mirror.

    We have already paid in full for the kitchen/bathroom accessories; a token for lighting and electrical appliances.

    We will have to pay an instalment to the main contractor and to decide on wall colour and kitchen material on Saturday.



    silver sister 银姐2010 ~ ! <3

    2:39 AM